The processes and techniques to analyze and verify the feasibility studies are:
| › Pull Production; |
› Machine Capability; |
| › Manufacturing Cells; |
› Failure Mode and Effect Analysis (FMEA); |
| › Single Part Flow; |
› Statistical Control of the Process; |
| › Produced Quality; |
› Poka Yoke; |
| › Overstock Elimination / Clearance; |
› Total Productive Maintenance; |
| › Just in Time /Just in Sequence; |
› Set Up. |
| › Milk run; |
|
Therefore, the losses and wastes associated to the process, such as:
| › Over Production; |
› Stock; |
| › Delay; |
› Moving; |
| › Transportation; |
› Rework; |
| › Processing; |
› Reflow; |
Can be eliminated or substantially reduced, guaranteeing the planned costs, the delivery schedules and assured quality